banner
Products
Appealing design
Ya Sheng 2022 High

Ya Sheng 2022 High

Overview How the spray tower works When the mixture from washing tower into the washing tower, due to the plate between ;
Overview
Basic Info.
Treatment Biological Treatment
Function Eco-Friendly
Color Customers Demands
Core Components Motor, Pump
After-Sales Service Provided Video Technical Support
Control Auto Control
Size 10t/D or 20t/D
Advantage Stable
Applicable Industries Energy & Mining
Warranty of Core Components 1 Year
Machinery Test Report Not Available
Usage Waste Gas Treatment Equipment
Use Electricity
Product Name Acid Mist Purification Equipment
Transport Package Customized on Demand
Specification Customized on demand
Trademark YaSheng
Origin Shandong, Taian
Production Capacity 30 Pieces / Month
Product Description
How the spray tower works
When the mixture from washing tower into the washing tower, due to the plate between the liquid product components, the product composition of liquefied gas evaporation section at the same time, and because impurity cannot be liquefied or solidification, when through the presence of liquid plate will be fixed liquid product components, washing effect, washing tower is according to the principle of design and manufacture. The scrubber USES the contact between the gas and the liquid to transfer the pollutants in the gas to the liquid, and then separate the clean gas from the polluted liquid to achieve the purpose of cleaning the air.

Product Description

PP spray tower operation procedure

First. Preparation before starting the machine

1. Add the water level of the tank and distribution tank to the equipment overflowport and open the inlet valve.

2. Check pump and fan, tighten each bolt in time.

Second, the boot Turn on the spray pump switch,and turn on the fan switch after the spray runs uniformly. Observe whether the pump and fan are running normally, whether there is leakage, whether there is abnormal sound.

Third, stop

Cut off the fan power, then cut off the spray pump power, clean the site.


Fourthly. Daily maintenance

1. When the water level of the distribution tank falls to 200mm above the water inlet of the pump, the distribution tank must be filled with water immediately to prevent the pump from burning out and the temperature in the tower istoo high.

2. The mixed liquid in the tank should be replaced every 7 days and the sludge should be discharged once a month toprevent the sludge from blocking the water inlet hole of the pump.

3. Fill in the equipment operation record for each shift.

Shandong Yasheng International Trade Co., Ltd.address: Zhouwangzhuang Village, Shankou Town, Daiyue District, Tai'an City,Shandong, Taian, China Main Products
The main products are waste acid treatment, acid washing wastewater treatment equipment, water reuse, acid mist exhaust gas
recycling equipment, industrial sludge recycle equipment, the recycling of the phosphate slag, integration of waste emulsified oil
treatment equipment, environmental equipment, and accessories, heat exchanger, mechanical equipment and accessories, electrical
equipment, electrical equipment, automation equipment, low-voltage distribution control equipment, graphite chemical equipment,
polypropylene anti-corrosion equipment.
Yasheng China Acid Mist Purification Equipment Factory Pp Flame Retardant Material Plastic Acid Mist Exhaust Gas Purification Equipment
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.

Ya Sheng 2022 High-Quality Laboratory Acid Mist Waste Gas Equipment Purification Tower Carbonization Tower

FAQ

Q: Are you a factory or trading company? A: We are a manufacturing factory. And you are welcomed to visit us for inspection. The quality control flow will show youour professionalism. Also, you will enjoy the best price and competitive price. Q: How long isyour delivery time? A:Generally it is within 2-30 days. Q: How do you guarantee the quality of the products? A: Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures and must be 100% quality before delivery. Q: What is the warranty period for the goods? A: All products from our warranty are 12 months.

Send inquiry